翻訳と辞書 |
Juscelino Kubitschek Power Plant : ウィキペディア英語版 | Irapé Dam
Irapé Dam, the tallest dam in Brazil,〔(【引用サイトリンク】url=http://www.cemig.com.br/sites/en/Sustainability/Programs/EnvironmentalPrograms/Irape/Pages/Plant.aspx )〕 is an embankment dam on the Jequitinhonha River in the state of Minas Gerais. It is on the border of Berilo and Grão Mogol districts, about west of Virgem da Lapa. The dam was constructed between 2002 and 2006 for the purpose of hydroelectric power generation. ==History== In 1963, the Jequitinhonha River was studied for its hydroelectric potential and the studies were reviewed in 1984. Brazilian power company CEMIG won the bid to build the Irapé Dam in 1998. Construction on the dam began in September 2002 and in September of that year, the power plant was officially renamed Juscelino Kubitschek Power Plant, after the former President of Brazil.〔 The river diversion was complete by April 2003 with two diameter tunnels; one in length and the other .〔〔 The dam's reservoir began to fill in December 2005〔 and the first of the power plant's generators was commissioned on 20 July 2006.〔 The second generator was commissioned in August and the third in October 2006. At the time of its completion it was the tallest dam in Brazil.〔〔〔〔
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Irapé Dam」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|